
alpflo · Parcel brief
What may be built on a parcel, article by article.
CHF 250 per parcel, excl. VAT, on invoice. In writing within three working days of the order being confirmed. Your first order is free until 31 January 2027: one per office, on a parcel your office has already worked on.
What may be built on a parcel, before you buy it: the commune's limits computed for this parcel, and every binding restriction. Every figure with its article and page.
Updated:
Why
The rules for a parcel are kept in many places.
Commune, canton and Confederation each keep their part. Gathering them for one parcel often takes a day.
- Cadastral surveyCanton
- PLR cadastreCanton
- Building actCanton
- Zoning rulesCommune
- One parcel briefalpflo
Identity
One address, resolved to its parcel.
With commune, zone and area. Where an address covers several parcels, the brief sets out each one.
- Parcel · EGRIDCH967406651550 · ✓ On record
- Parcel · number4801 · ✓ On record
- Parcel area1 815 m² · ✓ On record
Pictures: a building in Winterthur, for illustration. The figures are from the Weinberghöhe 19 sample in Zug.
Binding restrictions
Every binding restriction, from the PLR cadastre.
With legal status, announced changes, including those that already bind before they enter into force, and what a restriction means for a building project.
- Residential zoneW3 · ✓ On record
- Hazard zones2 and 3 · ✓ On record · BO § 65
- Noise sensitivity levelES II · ✓ On record
Pictures: a building in Winterthur, for illustration. The figures are from the Weinberghöhe 19 sample in Zug.
The limits
The limits, computed for this parcel.
Volume or floor area as a total for the parcel, storeys, heights, length and setbacks, each with its provision, page and date in force.
- Full storeys3 · ✓ On record · BO § 36
- Boundary setback6 m / 10 m · ✓ On record · BO § 36
- Countable floor area1 179.75 m² · ✓ On record · derived
Source: Bauordnung of the city of Zug (BO), § 36, residential zone 3: floor-area ratio 0.65 × 1 815 m² = 1 179.75 m² (derived).
Pictures: a building in Winterthur, for illustration. The figures are from the Weinberghöhe 19 sample in Zug.
Four states
Nothing found is not the same as nothing checked.
Every limit carries exactly one state. A value computed from cited values is “On record” and marked “derived”. A provision taken from a draft is “On record”, with “draft” in place of a date in force.
The sample
A parcel in Zug, residential zone 3: three pages, every limit cited.
A complete Parcel brief for Weinberghöhe 19 in Zug, residential zone 3, 1,815 m²: the Bauordnung's limits computed for this parcel, on three pages, in English.
A real parcel; rules and sources read on 15 November 2026.



Read the sample as a page: Weinberghöhe 19, Zug
CHF 250 per parcel, excl. VAT, on invoice. In writing within three working days of the order being confirmed. Your first order is free until 31 January 2027: one per office, on a parcel your office has already worked on.
Who it serves
Before buying, and before designing.
- Architects — the limits as formulas to design against
- Developers — the permitted floor area as a total for the parcel, before an offer is made
- Due-diligence consultants — what could block a project, every restriction with its article, page and date in force
Market value and heritage status are not part of a parcel brief. Natural hazards are linked; the brief does not assess them.
Coverage
Every commune in the connected cantons
alpflo makes the parcel brief for every commune in the cantons whose PLR cadastre is connected. alpflo reads the commune's building and zoning regulation for your order, within the same three working days.
Connected cantons
Binding PLR themes are connected today in these cantons: Zurich · Zug · Basel-Stadt · Aargau · Bern · Schwyz · Lucerne · Vaud · St. Gallen · Thurgau · Solothurn · Basel-Landschaft · Graubünden · Schaffhausen · Glarus · Uri · Obwalden · Nidwalden · Appenzell Ausserrhoden · Appenzell Innerrhoden · Geneva · Fribourg · Valais · Jura
This list describes where things stand today and does not guarantee completeness. If a provision cannot be read, the brief says so.
Every limit with its provision, its page and its date.
CHF 250 per parcel, excl. VAT, on invoice. In writing within three working days of the order being confirmed. Your first order is free until 31 January 2027: one per office, on a parcel your office has already worked on.
Frequently asked questions
What is an alpflo document — and what is it not?
An alpflo document is a sourced statement: in the Parcel brief, what the rules set for a parcel; in the plan check, whether a project's supplied dimensions meet them; in the area check, how large a dwelling is under the named rule. Every finding with its source and one of four states. It is not legal advice, not a permit decision and not a valuation.
What is not part of the Parcel brief?
alpflo does not assess natural hazards (flood, landslide, rockfall, avalanche): where the building ordinance places the parcel in a hazard zone, the brief cites the provision with article and page; the hazard itself is only linked. Value estimates and heritage / ISOS protection status are not part of it either.
Who makes the brief?
alpflo reads the commune's building and zoning regulation at the source; every figure points to its article and page.
What if a figure is wrong?
Report it within 10 days of delivery and the brief is corrected free of charge. Better still, test alpflo first: your first order is free, on a parcel your office has already worked on.
How is it different from parcel tools that cost a few francs?
Those tools state themselves that they do not replace an architect. The parcel brief gives every figure its article and page so you can check it, and states how certain it is with one of four states.